Industrial sourcing · China + India

Send the spec. We’ll find the right factory.

Industrial materials coordinated, documented and delivered through one accountable manufacturing network.

Oneaccountable operating team
271documented products
9material families
China + Indiatwo sourcing markets

Six useful starting points

Real catalog records with product photography, source specs and a direct route to a quote.

The work after the RFQ is where confidence is built.

Factory floor, inspection point and dispatch: the steps that turn a specification into a supply you can follow.

Workers forming industrial ducting in a factory
01

On the factory floor

The material is made against the agreed production requirement.

Factory inspectors measuring a steel component
02

Checked against the spec

Measurements and finish are reviewed before approval.

Steel beams loaded into a shipping container at a port
03

Prepared for dispatch

Packing and loading follow the agreed delivery path.

A quote is only useful if the paperwork survives procurement.

We return the commercial answer and the technical evidence together — so engineering, purchasing and logistics can review the same file.

  • Mill certificate path
  • Inspection option
  • Incoterms + port
  • Packing and lead time
Send us your specification

One request. One accountable path.

You keep one conversation while we coordinate pricing, documentation, inspection and delivery.

  1. 01

    Send one RFQ

    Send the grade, dimensions, quantity and destination.

  2. 02

    We coordinate the production route

    We match the requirement to suitable manufacturing capabilities and return the commercial and technical terms together.

  3. 03

    Inspection and certificates

    Available certificates and inspection options are listed with the quote.

  4. 04

    Delivered to your site

    We coordinate the agreed Incoterms, packing, port and delivery milestones.

Bring us the messy brief.

A drawing, an old certificate, a WhatsApp photo or a clean BOQ — we’ll turn it into a factory-ready request and tell you what is still missing.

Common standards across the catalog

EN 10204 3.1EN 10083-3ASTM A29ASTM A240ISO 9001ISO 4427EN 1506EN 10025DIN 8077ASTM B280SGS inspected